前坪水庫砂礫石黏土心墻壩三維流固耦合分析
 歷從實1,2,武穎利3,皇甫澤華1,張兆省1,韓艷2
(1.河南省前坪水庫建設管理局,河南 鄭州 450003; 2.河南省水利第一工程局,河南 鄭州 450000; 3.南京水利科學研究院,江蘇 南京 210098)
ThreeDimensional FluidSolid Coupling Analysis of Sandy Gravel Clay Core Dam of Qianping Reservoir
 LI Congshi1,2, WU Yingli3, HUANGFU Zehua1, ZHANG Zhaosheng1, HAN Yan2
(1.Heman Qianping Reservoir Construction Administration Bureau, Zhengzhou 450003, China; 2.Henan First Water Conservancy Engineering Bureau, Zhengzhou 450000, China; 3.Nanjing Institute of Water Conservancy Science, Nanjing 210098, China)

豫ICP備13002438號-6
版權所有 © 《人民黃河》編輯部
地址:河南省鄭州市金水路11號 《人民黃河》雜志社 郵編:450003 電話:0371-66022096 E-mail:[email protected]
總訪問量:  今日訪問:  當前在線人數:

人民黃河
  2019,Vol. 41(9): 118
  工程勘測設計
前坪水庫砂礫石黏土心墻壩三維流固耦合分析
 歷從實1,2,武穎利3,皇甫澤華1,張兆省1,韓艷2
(1.河南省前坪水庫建設管理局,河南 鄭州 450003; 2.河南省水利第一工程局,河南 鄭州 450000; 3.南京水利科學研究院,江蘇 南京 210098))
doi:
ThreeDimensional FluidSolid Coupling Analysis of Sandy Gravel Clay Core Dam of Qianping Reservoir
 LI Congshi1,2, WU Yingli3, HUANGFU Zehua1, ZHANG Zhaosheng1, HAN Yan2
(1.Heman Qianping Reservoir Construction Administration Bureau, Zhengzhou 450003, China; 2.Henan First Water Conservancy Engineering Bureau, Zhengzhou 450000, China; 3.Nanjing Institute of Water Conservancy Science, Nanjing 210098, China)
全文: PDF (2.31MB)
摘要: 針對前坪水庫工程砂礫石黏土心墻壩的特點,結合地質、設計和相關試驗資料,采用南水雙屈服面本構模型,開展三維流固耦合計算分析,計算考慮施工、蓄水時間效應以及運行期長期變形時間效應等,模擬前坪水庫工程壩體的填筑過程、施工后至蓄水前、蓄水過程以及運行期的壩體應力變形分布規律和工作性態。研究發現:考慮流固耦合作用時,砂礫石黏土心墻壩最大應力、應變都較耦合前大;壩體在施工期最大沉降率為1.25%,運行期累計最大沉降率為1.36%;施工期最大水平位移為17.7 cm,運行期累計最大水平位移為35.2 cm。
關鍵詞:
Abstract: Aiming at the characteristics of sandy gravel dam with clay core of Qianping Reservoir, combined with geology, design and related test data and Nanshui double yield surface constitutive model, this paper conducted the calculation and analysis on threedimensional fluidsolid coupling. The calculation considered construction and the effects of storage time and run time deformation and time effect for a long time, before the actual simulation flat reservoir dam in the actual filling process before and after construction to water storage, water storage process and operating period of dam deformation and stress distribution law and workability. The results show that the maximum stress and strain of sandgravel claycore dam are larger than those before considering fluidsolid coupling. The maximum settlement rate of the dam is 1.25% during the construction period. The cumulative maximum settlement rate during the operation period is 1.36%. The maximum horizontal displacement during the construction period is 17.7 cm and the cumulative maximum horizontal displacement during the operation period is 35.2 cm.
Key words: sandgravel clay core dam; fluidsolid coupling; stressstrain analysis; Qianping Reservoir
收稿日期:
基金資助: 河南省水利科技攻關計劃項目(GG201705)
作者簡介: 歷從實(1972—),男,河南通許人,高級工程師,主要從事水利水電工程建設與管理等工作